Old Catalogue
Manuscripts, oral history and pictures catalogue
Adlib Internet Server 5
Try the new catalogue. Start exploring now ›

Details



Print
152978
  • Title
    `Yeldham House', 12 Wallaroy Crescent, Double Bay/ architect Peter Stronach, 18 Allen Sreet, Glebe, 2037
  • Call number
    PXD 741/3/1-42
  • Level of description
    series
  • Date

    1976-1977
  • Type of material
  • Reference code
    152978
  • Physical Description
    Architectural and Technical Drawings - 42 architectural drawings
  • Scope and Content
    NOTE number in brackets refers to architect's Drawing Numbers
    1. Measured plans (Y1/1), Aug. 76
    2. Preliminary working drawing, section (Y1/1A), undated
    3. Floor plan (Y1B), undated
    4. Sketch proposal (Y1/2), Aug. 76
    5. Preliminary sketch propsal II (Y1/3), Aug. 76
    6. Measured elevations (Y1/4), Aug. 76
    7. Sketch elevations (Y1/5), Aug. 76
    8. Sketch plans (Y1/6), Sept. 76
    9. Plans (Y1/7), Sept. 76
    [NOTE drawings 1-9 were accredited with the consultation of Taylor Thompson and Whitting P/L, Consulting Engineers]
    10. Elevations (Y1/8), Sept. 76
    11. Sections (Y1/9), Sept. 76
    12. Sections A,B,C,D (Y1/10), Oct. 76
    13. Stair 1, plan and details (Y1/11), Oct. 76
    14. Stair 1, sections (Y1/12), Oct. 76
    15. Stair 2, plans and details (Y1/13), Oct. 76
    16. Bathrooms 2 & 3 (Y1/14A), Oct. 76
    17. Toilet (Y1/15C), Oct. 76
    18. Bathroom/ laundry (Y1/16), Oct. 76
    19. Bathroom 1 (Y1/17A), Oct. 76
    20. Doors (Y1/18), Oct. 76
    21. Plans- units 1 & 2 (Y1/20), Sept. 76
    21. Elevations (Y1/21), Sept. 76
    22. New swimming pool (Y1/22), Sept. 76
    23. Planning amendment 1 (Y1/23), undated
    24. Amended sketch plans (Y1/24A), Mar. 77
    25. Plans (amended) (Y1/25A), Sept. 76
    26. Elevations (amended) (Y1/26), Sept. 76
    27. Sections (amended) (Y1/27), Sept. 76
    28. Sections A,B,C (Y1/28), Mar. 77
    29. Electrical layout (Y1/29), undated
    30. Main bathroom details (Y1/30B), undated
    31. Kitchen/ laundry setout- unit 2 (Y1/31G), undated
    32. Living room, joinery details (Y1/32A), undated
    33. Kitchen/ laundry elevations (Y1/33C), undated
    34. Kitchen 2- details (Y1/34A), undated
    35. Bathroom 2- details (Y1/35), Apr. 77
    36. Electrical layout- unit 2 (Y1/37A), undated
    37. Back stair (Y1/38), undated
    38. Bathroom 3 detail, (Y1/39), June 77
    39. Kitchen details (Y1/40A), June 77
    40. Details for mechanical ventilation system installation (Y1/42B), Aug. 77
    41. Mechanical ventilation system to toilet (unit 2) (Y1/48), Sept. 77
    42. Stair 2 handrail (Y1/51), undated
  • Creator/Author/Artist
  • Topic
  • Place

Share this result by email