Old Catalogue
Manuscripts, oral history and pictures catalogue
Adlib Internet Server 5
Try the new catalogue. Start exploring now ›

Details



Print
52467
  • Title
    [George Gittoes Sydney Harbour Tunnel series]
  • Creator
  • Call number
    PXD 629
  • Level of description
    fonds
  • Date

    1991
  • Type of material
  • Reference code
    52467
  • Physical Description
    Drawings - 8 watercolour drawings - image 47 x 68 cm.-68 x 47 cm. on sheet 57 x 77 cm.-77 x 57 cm.
  • Scope and Content
    1. Tunnel construction southern end below Opera House, mobile form work in place for cement pour.
    2. Construction at southern section of tunnel under Botanical Gardens and Opera House - mobile form work still in place at left.
    3. Northern pylon interior demolition for installation of ventilation fans for tunnel.
    4. Tunnel construction North Sydney side facing north.
    5. Painter undercoating tunnel with black spray on sealant before final coats of white.
    6. The last remaining piece of Hawkesbury River sandstone. Its removal was a structural problem it held up part of the Opera House.
    7. Machinery used for tunnel excavation - Southern end.
    8. Construction workers inside the tunnel - foreground figure was a N.Z. Maori, Tom?
  • Copying Conditions
    Reproduction Restricted
  • Signatures / Inscriptions

    Gittoes 91 lower edge
  • Topic
  • Place
  • Browse collection hierarchy
  • Manuscript Index
  • A
  • B
  • C
  • D
  • E
  • F
  • G
  • H
  • I
  • J
  • K
  • L
  • M
  • N
  • O
  • P
  • Q
  • R
  • S
  • T
  • U
  • V
  • W
  • X
  • Y
  • Z

Share this result by email